Light Steel Workshop Construction Modern Factories
Accelerate your project timeline with our pre-fabricated steel building system. All components are precision-manufactured off-site for fast bolted assembly. Significantly reduce on-site labor and construction costs.
Details
Construction Method: Bolted primary frame.
Components: Pre-cut, pre-drilled, pre-welded.
Erection Time: Typically 30-50% faster than conventional methods.
Foundation: Simplified design due to lightweight structure.

